How many units make it series production in additive?
There is no numerical threshold, and that is the most common misunderstanding. Additive series production begins when the process is frozen and qualified and the part is reproduced with demonstrably constant properties: it can be true for fifty aerospace components a year and false for five thousand simple brackets, which are better injection moulded. The right question is about the value of the geometry, not the number of units.
How many times can metal powder be reused?
It depends on the alloy, the process and the checks you are prepared to run: it is not a universal number, and being wary of anyone quoting it as one is healthy. What matters is a written procedure defining sieving, reuse counting, any refreshing with virgin powder, and acceptance limits on particle size and chemistry — particularly oxygen and nitrogen for titanium and reactive alloys.
Does every part need industrial CT?
Almost never. CT is the right tool for internal defects and for channels no other method reaches, but it is slow and expensive: it is used during qualification, on first articles, then on a sampling basis, or at 100% only on components where failure has serious consequences. A well-built inspection plan spreads the effort across dimensional, density, witness specimen testing and targeted NDT.
What documentation does an aerospace or medical customer require?
Typically: material certificate with powder batch traceability, evidence of process qualification, build job records, witness specimen test reports, dimensional report and declaration of conformity. Aerospace adds first article approval to EN 9145; in medical all of it lives inside an ISO 13485 quality system.
How much does post-processing add to part cost?
More than almost anyone expects, and on many components it exceeds the cost of the build. Support removal, heat treatment, plate separation, surface finishing and machining of functional surfaces must be budgeted from day one: a part cost calculated on machine time alone is a wrong cost, and it is usually discovered after the order is won.
What happens if I change machine or supplier?
The process has to be requalified. Parameters are not transferable between different machines, nor between two machines of the same model without verification: optical path, gas flow and calibration all differ. It is one of the reasons choosing a production supplier is a strategic decision rather than a purchase, and it is taken before the design is frozen.